- Final Shortlist
- Poster Presenters
- Guidelines for the Final Presentation
- Guidelines for the Poster Presentation
- Contact
Final Shortlist
DMAIC Manufacturing
| Hoerbiger | Reduction of Casting Rejection in Aluminium Casting. (W-HOUSING CASTING) |
| John Deere | Improve PTO HP for IT4 Engine |
| Reliance Industries Limited | Reduce Packing Cost for Fully Drawn Yarn |
DMAIC Services
| Firstsource Solutions Limited | Enhancing Customer Experience |
| HSBC Bank PLC | Factoring Collections Process Improvement |
| Syntel Inc. | Defect Elimination In Asset Management Using DMAIC Approach |
Lean Manufacturing
| Bharat Electronics Limited | Reduction In Cycle Time Of Assembly Of Data Cables Of Stars V Project |
| John Deere India Pvt Ltd | Lean Manufacturing Implementation On Hood Sub Assembly |
| SKF India Limited | Forging Yield Improvement By Reducing Forging Input Weight By 12 % At Supplier End |
Lean Services
| Capgemini Business Services | Process House Parivarthan |
| HSBC Bank PLC | Credit Approval Process Reengineering |
| Sutherland Global Services | Reduction of Customer Call Handle Time |
DFSS
| John Deere Equipment Private Limited | Steering System Design and Optimization |
| Reliance General Insurance Company Limited | Improve Fraud Identification for Health Claims |
| Wipro Technologies | Embedded Web Browser Development |
Lean and DMAIC Support
| John Deere Equipment Private Limited | Reduce Breakdown Orders for Spare Parts |
| Wipro BPO (A division of Wipro Limited) | Technology project transition lead time reduction from 10.12 weeks to 8 weeks |
International
| Ansell Lanka – | Manufacturing Cost Reduction of Hyflex 11-920 Product |
| Brandix | Improving Receive to Ship @ Brandix Textiles |
| Spimaco | Process Improvement in Pharmaceutical Quality Control Laboratory |
Poster Presenters
DMAIC Manufacturing
| Larsen Toubro Ltd | To eliminate crack in Boss of Handle Holder of Product: Pms25 |
| SKF Limited | Grinding Allowance Optimisation for Inner and Outer Rings (Bearing Components) |
DMAIC Services
| Computer Sciences Corporation | Streamlining of Hyderabad Transport Services |
| Reliance Capital Asset Management Limited | Increasing Productivity of Retail Distribution |
Lean Manufacturing
| Reliance Industries Limited | To Improve Loading from 95% to 99% in Cp-10 Spinning |
Lean Services
| Cognizant Technology Solutions | Improve Process Velocity and Efficiency in the core operations |
| HCL Technologies Ltd., BPO Services, Chennai Region | Productivity Improvement |
| Hinduja Global Solutions limited | Improvement of productivity For NCNEMA Region |
DFSS
| Reliance Industries Limited | To develop high differential Shrinkage Product 70/36 Fdy For Special Georgette Effect in the Fabric |
Lean and DMAIC Support
| Cognizant Technology Solutions | Reducing Rams Cost For Abc Account - Lead Time Reduction |
| HSBC | Review of the Pre Due Calling process in Cards |
The Guidelines for the final presentation are as follows
- Maximum limit to the number of slides for presentation is 25. Presentations that have been sent for preliminary evaluation should be used during the presentation day. (NO change of presentations is allowed).
- Time Limit: Presentation – 15 minutes(warning) + 2 min(End up time)
- Q & A session – 7 minutes
- Change over – 3 minutes
The Guidelines for the poster presentation are as follows
- Posters should be made of A2 size charts only. Any deviations will lead to disqualification
- Maximum of 2 posters per company is allowed
Contact
- For any queries contact- Aswin C. : 09975205518 or Rakesh Majumdar : 09892185128
